|






















| |

Summer -
Fall 2008 Projects
Updated 11-05-08
SF
Project Signup Form -
Click Here
(PDF file)
|
|
Summer & Fall 2008 Projects |
|
|
|
Please be aware that the work descriptions listed for ANY of
our projects are subject to change by the time the project begins. Your team
leader will provide updated work/priority lists just prior to the start of
the project. |
Please assume the following unless specified otherwise in
the project description:
There are RV sites with water and at least 30 amp electric,
provided free of charge Pets are allowed on a leash
Showers are not available
Altitude is less than 1000'
Housing is not available
Security has not been a concern
Daily meals are not provided (Leader to clarify with agency
and advise team)
A phone jack or computer is available for email but hours
may be limited
RV parking is on site
Dump station is on site or there is a sewer connection at
each site
Max RV length is at least 40'
Hard labor is less than 50% of work
Background checks not required (Leader to verify with
agency)
$$=fee charged for meals WIFI=Wireless Internet connection
available
|
See OPENINGS below |
|
WO = Worker opening |
LO =
Leader opening |
FULL = No openings |
|
|
|
Fall Projects |
|
|
|
|
|
NOMADS ANNUAL REUNION |
Shawnee, OK September
22-26th, 2008 |
|
|
|
Period 14 |
October 27 - November 13, 2008 |
|
|
|
|
State |
City |
Agency |
# Units |
|
|
AL |
Selma |
United Methodist Children's Home |
5 |
FULL |
|
Showers, WIFI, housing may be available. Work: Regular
maintenance for 10 cottages and other buildings, clerical-culling old files,
getting them ready for microfilming. www.umch.net |
|
|
|
AL |
Sylvania |
Upper Sand Mountain Parish |
4 |
WO |
|
NOTE -
Tornado
Damage |
Alt. 1300', RV sites 2 miles from worksite, no large RV's,
showers, background checks required. Work: Tornado Damage repair and renovation of low-income family
home ownership initiative (carpentry, painting, cleaning, wallpapering),
yard work, package food for pantry, work with green tomato products,
maintain USMP ministry center, install vinyl siding.
www.uppersandmountainparish.org |
|
|
|
AR |
Perryville |
Heifer Project International |
3 |
FULL |
|
No pets, some meals may be provided, WIFI. Work: general
construction, building global village site, renovations on structures such
as barns. www.heifer.org/ranch |
|
|
|
AZ |
Buckeye |
Community Church of Buckeye |
5 |
LO, WO |
|
Cancelled |
Truck pickup of sewer if necessary. Work: repair walls,
paint, trim kitchen, replace and paint doors, repair door frames, scrape and
paint exterior, replace exterior lights, replace and paint soffits, repair
ceiling tiles, repair door jambs, rework steeple. |
|
Cancelled |
|
AZ |
Phoenix |
Creighton United Methodist Church |
4 |
WO |
|
Alt. 1100', WIFI. Work: extensive interior and some exterior
painting. |
|
|
|
AZ |
Tucson |
TMM Family Services |
3 |
LO, WO |
|
Cancelled |
Altitude 3,000', showers, walk pets off campus, Security:
visual caution recommended. Work: maintenance, small construction projects,
cleaning, painting, minor electrical, plumbing, carpentry, landscaping,
masonry work. Assist with special events. |
|
Cancelled |
|
MS |
Moss Point |
Caswell Springs United Methodist Church |
7 |
LO, WO |
|
Changed
to
RTP |
Showers, distance to worksites varies and can be as much as
20+ miles, WIFI. Work: hurricane related community home repairs to include
roofing, demolition, sheetrock, taping, painting, trim, etc. Leader this
period should arrive early to overlap. |
|
Changed
to
RTP |
|
NC |
Lake Junaluska |
Lake Junaluska Assembly |
8 |
WO |
|
Altitude 3000', showers, housing may be available, no phone
jack for email. Work: rebuild wooden floors, interior and exterior painting,
stone work, glass blocks in windows, replace wooden railings, landscaping
and green house work, office work. www.lakejunaluska.com |
|
|
|
SC |
Mt. Pleasant |
United Methodist Relief Center |
6 |
LO, WO |
|
Cancelled |
Showers, no pets, housing may be available, worksites may be
up to 35 miles from RV sites, work hours may vary from NOMADS guidelines, no
email access. Work: general home repair for low income rural residents. May
include installing wheelchair ramps, installing siding, sheetrocking and
painting. www.umrc.org |
|
Cancelled |
|
TX |
Dallas |
Munger Place United Methodist Church |
3 |
LO, WO |
|
Cancelled |
Church is working to upgrade electrical hookups to 30 amp,
WIFI, Security: typical concerns for an urban neighborhood. Work: extensive
list of painting and repair projects on historic parsonage, church and
education buildling. Also landscaping projects. www.mungerplace.org
|
|
Cancelled |
|
TX |
Jacksonville |
Lon Morris College |
5 |
FULL |
|
Showers, housing may be available, spring '08 NOMADS team
upgraded electric to 30 amp. Work: repairs and renovation to include
drywall, floors, HVAC, roofing, electrical, plumbing and painting.
|
|
|
|
TX |
Lindale |
Mercy Ships |
3 |
FULL |
|
Showers, housing may be available-fee charged, WIFI. Work:
kitchen remodel to include demolishing one wall and ceiling, replace
insulation, sheetrock, light fixtures, cabinets, tape, float, paint. Also
exterior remodel of pump house to include removing old materials and
replacing insulation, OSB, Tyvek and hardy sheathing. Clear cut timber 10'
from road and move fence. www.mercyships.org. |
|
|
|
|
|
|
|
|
Period 15 |
December 1 - 18, 2008 |
|
|
|
|
State |
City |
Agency |
# Units |
|
|
AZ |
Lake Havasu City |
St. Michaels United Methodist Church |
3 |
FULL |
|
Showers, dump station on site, housing may be available.
Work: finish sanctuary remodel, install lighting, painting, build moveable
panels, remove arches. |
|
|
|
LA |
New Iberia |
First United Methodist Church |
5 |
LO, WO |
|
Cancelled |
Showers, commercial RV park will be used, no email, housing
may be available. Work: low income housing rehab, interior and exterior
work. |
|
Cancelled |
|
MS |
Moss Point |
Caswell Springs United Methodist Church |
7 |
WO |
|
Changed
to
RTP |
Showers, distance to worksites varies and can be as much as
20+ miles, WIFI. Work: hurricane related community home repairs to include
roofing, demolition, sheetrock, taping, painting, trim, etc. Leader this
period should arrive early to overlap. |
|
Changed
to
RTP |
|
TX |
Glen Rose |
Glen Lake Camp and Retreat Center |
4 |
WO |
|
Showers, using commercial RV Park 2 miles from worksite,
housing may be available, WIFI, background checks required (they will run
them and pay for them). Work: remove roof, gut interior and remove trim on
old cabin. Rebuild to original condition and setup to be used as museum.
Masonry knowledge would be helpful. www.glenlake.org |
|
|
|
TX |
Luling |
Wm. Taylor United Methodist Church |
4 |
FULL |
|
They have 3-30 amp and 1-20 amp site, no email access, 50%
hard labor, continuation of work from spring '08 project. Work: add
restroom, lower ceiling, insulate walls and ceiling, install AC, install
carpet, repair roof leak, rearrange kitchen cabinets, replace doors, locks
and deadbolts, repair windows. |
|
|
|
TX |
Port Isabel |
First United Methodist Church |
3 |
FULL |
|
Project
postponed
Spring
2009 |
This
church was damaged by Hurricane
Dolly in the last month or two.
Church has decided to wait until some roof repairs are
made that involves insurance. Then will reschedule next spring. |
Project Postponed
Spring 2009
|
|
|
|
|
|
|
Posted 4-02-08
Back to Top
|